February 01, 2014 | Patricia
Image 2 carried out a series of photos and Time-lapse video of the on-site assembly of a fantastic German designed modular pre-fabricated house.
This did not take long – a dozen or so lorry loads over 4 days and the main structure was up just like Lego. This is the way to build!!
Categories: Construction Photography, Time Lapse